The Team's Senior Technical Representative
(STR), Mr. Clayton Spikes, ensures strict adherence to the MAI
Quality Assurance (QA) process, which produces and/or updates
TO documents efficiently and with high quality. Mr. Spikes will select a Lead Analyst/Senior
Engineer to head up the development/production of each deliverable. The
Lead Analyst/Senior Engineer will review the task requirements
with the government Principal Investigator (PI) and the STR, including
time, specification, and delivery dates, and will commence the
task's accomplishment. Tasks will be reviewed on a weekly
basis. If an existing TO document is to be updated, every
effort will be made to develop change pages, or pen-and-ink change
narrative, in order to minimize cost. If a more extensive
update is required, the first objective is to determine the availability
of existing word processing files/disks and compatibility. The
same process is followed for production if the MAI Team is required
to develop a new TO document. At this time, adjustments
in priorities will be made, and work assignments shifted, if required,
in order to ensure that task accomplishments and CDRL delivery
dates are met.
The MAI Quality Control (QC) process,
a subset of the QA process, promotes quality control checkpoints. The quality of MAI
Team products delivered to the government is of paramount importance. This
checklist is a mandatory requirement for all MAI Team deliverables. A
series of QC checkpoints will be used to ensure built-in quality
as a product proceeds toward delivery. Activity taking place
at each checkpoint includes:
- Generate a unique QC checklist. Document
Specialist performs automated spell check;
- Technical review and revisions by the Lead Analyst/Senior Engineer;
- Verification by the Lead Analyst/Senior
Engineer that revisions have been incorporated, format has
been checked, and final proofreading accomplished. QC
checklist has been completed at this point;
- Final review and accuracy check in meeting task requirements
along with a final review of the QC checklist by the MAI STR.